From bid schedule to bid,
priced in Clara.

Upload the owner's unit-price bid schedule. Clara suggests a price for every item from your past estimates and bid tabs, and flags what is unclear. You review, adjust and export.

Hand over the first pass, keep the decisions: Every price shows where it came from, and nothing goes out without your approval.

ClaraBid Agent81of 86 items priced
Today, 2:40 PM
Price the bid schedule from our past bids
Pricing 86 bid items
Priced 81 of 86 items in 1m 08s

81 of 86 items priced from your past estimates and bid tabs. 5 are open for your estimator, like temporary power: a lump sum with no description.

Suggested prices
04 22 00 CMU wall, 8 in.Past bids$18.40 per SF, average of 3 bids[1][2][3]
08 11 13 HM door, 90-min ratedEstimate$1,240.00 per EA, clinic, 2024[4]
SuggestionsShow the 5 open itemsCompare with past bids
Ask Clara about bids or your company...
Bid_Schedule_Elementary_No8.xlsxSavedDocument 5 of 7
D6fx18.40
ABC
01General requirements
01 50 00Temporary facilities1 LS$18,400.00
01 51 00Temporary power1 LSNeeds you
03Concrete and masonry
03 30 00Slab on grade, 5 in.4,435 SF$9.15
04 22 00CMU wall, 8 in.1,600 SF$18.40
08Openings
08 11 13HM door, 90-min rated12 EA$1,240.00
08 51 13Aluminum window, 4 x 5 ft34 EA$685.00
09Finishes
09 21 16Gypsum board partition1,030 SFNeeds you
Bid schedule81 of 86 itemsExport to XLSX

Sample bid and sample data. Items, quantities and prices are illustrative.

02The process

Four steps
to a priced bid.

ClaraBid Agent86items read
Bid_Schedule_Elementary_No8.xlsxOwner's unit-price bid schedule
Read the bid schedule
Reading the bid schedule
Read 86 items in 11s

86 items in 4 divisions, 1 base bid. I took over the item numbers, CSI divisions, descriptions, quantities and units, with the owner's numbering.

From the schedule
04 22 00 CMU wall, 8 in.Item1,600 SF
08 11 13 HM door, 90-min ratedItem12 EA
09 21 16 Gypsum board partitionOpen1,030 SF, wall type not stated
Ask about this bid schedule...
ClaraBid Agent4notes with sources
Anything to watch before we price?
Checking the bid package
Checked the package in 12s

4 notes, each with its source. One item cannot be priced as written.

Notes
09 21 16 partition: wall type missingOpenBid schedule, item 09 21 16
Liquidated damages $1,500 a day, no capRiskSupplementary Conditions 00 73 00p. 31
Electronic bids only, due Dec 8, 2:00 PM CTOpenInvitation to bidp. 3
Alternates 1 to 3 priced separatelyDoneInstructions to biddersp. 11
Ask about this bid schedule...
ClaraBid Agent81of 86 items priced
Bid_Schedule_Elementary_No8.xlsxSavedDocument 5 of 7
D3fx18.40
ABC
03Concrete and masonry
03 30 00Slab on grade, 5 in.4,435 SF$9.15
04 22 00CMU wall, 8 in.1,600 SF$18.40
08Openings
08 11 13HM door, 90-min rated12 EA$1,240.00
08 51 13Aluminum window, 4 x 5 ft34 EA$685.00
Bid schedule81 of 86 itemsExport to XLSX
ClaraBid Agent3files ready
Export the priced schedule
Preparing the export
Prepared 3 files in 6s

Ready for your review. Pick a format. Your team fills in the owner's bid form and submits.

XLSX, priced bid scheduleFor your estimating software
PDF, bid for internal reviewWith the price origin for every item
CSV, mapped to cost codesFor your job cost system
Export to XLSXShow open items
Ask about this bid schedule...
03Price origin

Every price
has a source.

Clara never suggests a price without showing what it is made of. Labor, material, equipment and overhead and profit come from your past estimates and bid tabs in the AI Brain, each with its source.

  • Broken downEvery unit price shows its components, just like your estimate workbook.
  • Against your historyPast prices for the same work sit alongside. Outliers stand out at once.
  • Your decisionEvery suggestion can be edited, and nothing goes out without your approval.
ClaraBid Agent18.40per SF
Where does the CMU wall price come from?
Checking your records
Checked 3 bids and 4 sources in 6s

$18.40 per SF for 1,600 SF, $29,440.00 in total. It sits inside your past range for this work, $17.60 to $19.20.

Price origin, 04 22 00
Labor, $9.80Estimate0.20 h/SF at $49.00/h, middle school, Austin 2025[1]
Material, $6.10Supplier quotes8 in. CMU, mortar and grout, average of 3 quotes[2]
Equipment, $0.60Your ratesMixer and scaffold, pro rata[3]
OH&P, $1.90Markup sheetOverhead and profit, 11.5%[4]
Ask about this bid schedule...

Sample bid and sample data. Items, quantities and prices are illustrative.

04Open items

Unclear items are flagged,
not guessed.

If the bid schedule is missing a detail, Clara does not invent a price. The item goes onto a list with the reason and the source, which you work through before bid day.

  • Reason and source for every open item
  • Questions to the owner and assumptions in one place
  • Nothing is exported while an item is open
ClaraBid Agent1item open
Which items are still open?
Checking 86 items
Checked 86 items in 4s

1 item is still open. 3 of the 4 I flagged are settled. Nothing is exported while an item is open.

Open items
09 21 16 Gypsum board partitionSettledWall type was missing. Assumed UL U419 per the spec, $6.85/SF.p. 212
07 13 00 Below-grade waterproofingSettledMembrane type not stated. Question to the owner drafted.Division 07
08 12 13 Hollow metal frameSettledQuantity 0 in the schedule, 6 in the door schedule. Clarification added.Sheet A-601
01 51 00 Temporary powerOpenLump sum with no description. Needs your estimator.Division 01
Ask about this bid schedule...

Sample bid and sample data. Items, quantities and prices are illustrative.

05Totals and outliers
ClaraBid Agent1,582,200base bid
Totals by divisionBase bid · 86 items · Elementary School No. 8Excel
DivisionItemsShareTotal
01 General requirements6$42,300
03 Concrete and masonry30$1,184,600
08 Openings22$196,400
09 Finishes28$158,900
Base bid total86$1,582,200
03 30 00 Slab on gradeOutlierYour unit price of $9.15/SF is 14% below your median of 5 past bids ($10.65). Priced like this on purpose?5 past bids

Sample bid and sample data. Items, quantities and prices are illustrative.

The total adds up,
before it goes out.

Clara totals every division, the base bid and each alternate, and compares each unit price with your past prices for the same work. If a price is far off, you see it before bid day and decide on purpose.

  • Totals by division and alternate
  • Outliers against your own prices
  • The reasoning stays on the item
06Data basis

Priced with
your own prices.

Clara does not price with market averages from the internet but with what your company has already estimated, bid and built. The AI Brain keeps these documents in order, and every new estimate is added.

  • Past estimatesEstimate workbooks
  • Your past bidsBid tabs, XLSX, PDF
  • Sub quotesQuotes, bid tabs
  • Supplier quotesMaterial prices
  • Markup sheetOverhead, profit, bond, insurance
  • Equipment ratesOwned and rented
ClaraBid Agent
Suggested prices
04 22 00 CMU wall, 8 in.Past bids$18.40 per SFLabor from Austin 2025Materials, avg. of 3 suppliersYour markup sheet
  • US data residency for storage and AI processing
  • Isolated tenant: nobody but your team sees your prices
  • No training of AI models on your estimates
  • SOC 2 Type II in progress
InXLSXCSVPDFScanned PDF OutXLSXCSVPDF for review

Price the next bid schedule
with Clara.

Bid pricing is a feature of Clara · pricing on request

07FAQ

Data and formats

Which files can Clara price?

Clara reads owner bid schedules and unit-price bid forms as XLSX or PDF, scanned PDFs included, and takes over bid items, quantities, units and descriptions. Clara exports the priced schedule as XLSX or CSV.

Can I take the bid into my estimating software?

Yes. Clara exports the priced schedule as XLSX or CSV, mapped to your cost codes, which common estimating tools import.

Where do the quantities come from?

The quantities come from the owner's bid schedule. If you want to take off or check quantities from the plans yourself, Theo, the AI agent for quantity takeoff from 2D PDF plan sets, does that.

Prices

Where do the unit prices come from?

Clara suggests unit prices from your past estimates and bid tabs in the AI Brain. For every item you see where the price comes from, for example a past project or the average of several bids.

What happens if there are no earlier prices for an item?

Then Clara flags the item as open instead of inventing a price. You set the price yourself or add a sub or supplier quote. From then on the price is available for future estimates.

How does Clara account for my markups?

Overhead, profit, bond and insurance come from your own markup sheet. In the unit price you see them as a separate share next to labor, material and equipment.

Can I adjust the prices?

Yes. Every suggestion can be edited, and nothing goes out without your approval. The estimate is then kept in the AI Brain and is available for future bids.

Process and control

What happens with unclear items?

Unclear or incomplete items are flagged instead of guessed, with the reason, for example a wall type missing in the bid schedule. You settle them in one list before bid day.

Does Clara spot unusual prices?

Yes. Clara compares every unit price with your earlier prices for the same work and flags outliers, so you decide on purpose whether a price stays.

Who approves the bid?

Always you. Clara prepares the estimate; approval lies with you or the people you set for it in your team. Nothing goes out without approval.

Security and cost

Are my estimates used for training?

No. Your estimates and prices are not used to train AI models. Storage and AI processing run on US infrastructure, and every organization is isolated.

Is bid pricing fully developed yet?

Bid pricing is a feature of Clara. Founding cohort teams use it today, and their feedback goes straight into development.

How much does bid pricing with Clara cost?

Bid pricing is part of Clara and included in the BAU AI plans. Prices are on request while the founding cohort is open.