Patrick · AI project management agent

AI construction project management, from award to closeout.
Every date and action owned.

Patrick is the AI project management agent for general contractors. He opens the job from the won bid, keeps the schedule, three-week look-ahead and critical path current, tracks buyout, turns meetings and site walks into action items with owners, and runs the punch list to closeout. Your project manager makes every call.

Patrick · founding cohortOnboarding on one of your live jobs
Three-week look-aheadNov 4 to Nov 20 · critical path in colorOn track
Nov 41118
  • Framing L2 east
  • Roof deck
  • Drywall delivery
  • MEP rough-in L2
  • InspectionNov 20
Option ADrafted for your schedulerHolds Nov 20

Start rough-in on the west half Nov 11 while the drywall balance arrives Nov 13.

WithoutNov 24→With option ANov 20
Synced with Primavera P6412 activities · logic kept

Sample data · Patrick drafts, your team approves

Patrick at work · sample data

What does Patrick do with
the next three weeks?

Four steps, from the master schedule to the look-ahead your foremen work from, with the late delivery that threatens it. Scroll, and watch it happen.

PatrickJob 2417 · ScheduleSynced with P6
ScheduleThree-week look-aheadMaster3 weeksCritical path1 milestone at riskNov 20 holdsImport
  1. Activity
  2. A2080Demo, level 2MJ
  3. A2140Framing, level 2 eastLR
  4. A2190Roof deck, bays 1 to 6TS
  5. M-14Drywall deliveryLS
  6. A2210MEP rough-in, level 2KM
  7. A2250Window install, southGP
  8. A2290Rough-in inspectionCT
  9. A2320Drywall hang, level 2DH
Wed 456SatSunMon 910111213SatSunMon 1617181920SatSun
Today
Demo
Framing
Roof deck
540 of 600 shDrywall delivery
MEP rough-inWest halfEast half
Window install
Nov 20Nov 24
Drywall hang

Import from Primavera P6Job2417_Baseline.xer

  • 0 activities
  • 0 logic links
  • Calendars kept

38 activities fall in the next three weeks

Signals this week

Lex: framing 62%From today’s daily report
Dario: drywall 60 sheets shortBalance arrives Nov 13
Rough-in slips 2 daysInspection moves to Nov 24

Option AHolds Nov 20

Start rough-in on the west half on Nov 11, east half when the balance lands Nov 13.

  • Critical pathHeld
  • Subs to notify2
  • Float on A22100 days
Apply option
  1. 01 / 04Import

    Bring in the schedule you already have from MS Project or Primavera, or build it in the Gantt chart.

  2. 02 / 04Look ahead

    Patrick builds the three-week look-ahead and marks the critical path.

  3. 03 / 04Watch

    Field progress from Lex and deliveries from Dario show where dates are at risk.

  4. 04 / 04Decide

    Patrick drafts the options. Your scheduler picks one and the look-ahead updates.

Sample data. Patrick prepares and checks, people on your team approve.

1*view of schedule, buyout and punchPer job, with the person who owns each item.
3 wks*look-ahead, always currentRebuilt from field progress every day.
0*action items without an ownerEvery task has a person and a due date.
2 days*warning before a milestone slipsRisks show while there is time to act.
100%*of decisions by your teamPatrick drafts options; your PM decides.
16*project management featuresFrom project setup to warranty.

*Illustrative

16 capabilities

What can Patrick do for
construction project management?

Everything Patrick covers on the job, in one list. Each one is a first pass your team reviews and approves.

See all features by agent →
  1. 01Project setup from the won bid

    When a bid is won, the job opens with its budget, schedule, contacts and contract terms already in place.

  2. 02Project health dashboard

    One view per job of schedule, buyout, open items and risks, with the owner of each.

  3. 03Project schedule and milestones

    Build or import the schedule as a Gantt chart with milestones and logic.

  4. 04Three-week look-ahead

    The look-ahead your foremen work from, built from the master schedule.

  5. 05Critical path

    The critical path marked and recalculated as dates move.

  6. 06Schedule risk alerts

    Field progress and deliveries show where dates are at risk before they slip.

  7. 07Schedule recovery options

    When a date is at risk, Patrick drafts options to hold it. Your scheduler decides.

  8. 08Subcontractor look-aheads

    Each subcontractor sees their own look-ahead and confirms their dates.

  9. 09Buyout log

    Track every trade from bid to signed subcontract, with dates, values and the savings against the estimate.

  10. 10Action items and owners

    Every open task on the job, with an owner, a due date and the record it came from.

  11. 11Photo-to-punch list

    Site walk photos become draft punch items with location, trade and the photo they came from.

  12. 12Punch items pinned on the plan

    Every item pinned to its spot on the floor plan.

  13. 13Punch assignment to trades

    Items go to the responsible trade with due dates, then close on a photo of the fix.

  14. 14Closeout, defects and warranty

    Track defects through closeout and into the warranty period.

  15. 15Owner closeout view

    Read-only punch and closeout status for the owner, shared only when you choose.

  16. 16Daily schedule recap

    A short recap beside the Gantt: what moved today and why.

Follow the chain

Where does a date
at risk come from?

A warning on the look-ahead always shows its driving path: what happened on site, which activities it pushes and the date it moves. Then the options, side by side.

PatrickSchedule · A2290
ScheduleA2290 · Rough-in inspectionAt riskCity of Austin · booked Nov 20

Why this date movedDriving path, from the field to the milestone

  1. M-14Drywall deliveryDario: 540 of 600 sheets, balance Nov 13Short
  2. A2310Drywall hang, westNeeds the sheets Nov 12, slips 1 day+1 d
  3. A2210MEP rough-in, level 2Critical, float 0 days+2 d
  4. A2290Rough-in inspectionMoves from Nov 20 to Nov 24Nov 24

Options

A. West half firstNov 20

Start rough-in on the west half Nov 11, east when the balance lands.

B. Wait for the balanceNov 24

Rebook the inspection, 4 days later.

C. Weekend crewNov 20

Saturday shift for 2 trades, extra cost.

Patrick drafts the options. Your scheduler decides.

NewEarly access

Try Patrick.
On one of your live jobs.

Patrick is offered to the US founding cohort. We set him up with each team on one of their own jobs, with their schedule, buyout and subs.

  • Onboarding on your own job a working session on a project of yours
  • A direct line to the product team your feedback goes to the people building Patrick
  • Founding-cohort terms pricing on request, agreed before general availability

Request access

Tell us about one job you are running. We reply personally and set up a session on your own schedule and punch list.

Join the founding cohort
FAQ

Getting started

Who can use Patrick today?

Patrick is available to the US founding cohort. We keep the group small so each team gets hands-on setup and a direct line to the product team.

How does onboarding work?

We set a date and set Patrick up with you on one live job: your schedule file, your buyout log and your punch list template.

What does Patrick cost?

Patrick is not part of the published plans yet. Founding-cohort terms are agreed with each team, and pricing is on request.

How it works

Does Patrick work with Primavera P6 and MS Project?

Yes. Import a P6 XER or an MS Project file with logic, float and calendars kept, or build the schedule in the Gantt chart. The look-ahead and critical path stay current from field progress.

Does Patrick replace our project manager?

No. Patrick keeps the schedule, buyout, action items and punch list current and drafts options. Your project manager decides and approves every order, change and date.

Who handles purchase orders and deliveries?

Dario, BAU AI’s procurement and logistics agent. Patrick sees each order and delivery against the schedule and flags anything that puts a date at risk.

How does the punch list close?

Site walk photos become draft punch items pinned to the plan. Each is assigned to the trade, and closes only after someone on your team checks the photo of the fix or the work on site.