Clara · Public ownersEarly access
Independent cost estimates.
For public owners and agencies.
Before you advertise, you need a number that holds up: an estimate to set the budget, choose the procurement path and judge the bids. Clara drafts it from your drawings and your own past prices, by CSI MasterFormat division, every amount with its source. Your engineers review and approve.
CSI MasterFormat · FAR 36.203 · Bid tabulation
| Division | Work | Amount |
|---|---|---|
| Div 03 | Concrete | $1,240,000 |
| Div 05 | Metals | $860,000 |
| Div 07 | Thermal and Moisture Protection | $640,000 |
| Div 09 | Finishes | $910,000 |
| Div 22 | Plumbing | $420,000 |
| Div 23 | HVAC | $780,000 |
| Div 26 | Electrical | $690,000 |
| Total, listed divisions | $5,540,000 |
Example · Clara drafts, your engineers review and approve
What Clara does
Four results before you advertise
From the first budget number in schematic design to the yardstick you measure the bids against.
- Schematic design
Conceptual estimate
From the schematic design, program or project description, Clara drafts the budget estimate by division or building system.
- Areas and quantities from the drawings, measured by Theo
- Benchmarks from your own comparable projects
- Construction documents
Engineer's estimate
With the construction documents, the estimate becomes the independent cost estimate, priced item by item, with changes from the budget explained.
- Comparison with the conceptual estimate per division
- Unusual benchmarks flagged for review
- Procurement file
Documented basis
Clara writes up how the estimate was built: sources, escalation to the bid date, quantities and assumptions, ready for the procurement file.
- Escalation and location adjustment stated
- Assumptions and exclusions listed
- Bid schedule
Priced bid schedule as the yardstick
Clara prices your own bid schedule before you advertise. When the bids arrive, Nova checks every bid against it.
- Unit prices per item with their source
- Low, high or unbalanced bid prices flagged
Estimate stages
Which estimate, when?
Clara covers the estimates you need up to the bid opening.
| Stage | Detail | What Clara delivers |
|---|---|---|
| Conceptual estimateSchematic design | Division or system level, e.g. Div 03 Concrete | Draft per division, with benchmark and comparable project |
| Engineer's estimateConstruction documents | Bid item level, matching your bid schedule | Draft with quantities measured by Theo and a comparison with the budget |
| Pre-bid checkBefore you advertise | Total and per bid item, with basis | Amount and documented basis for the procurement file |
For federal construction, FAR 36.203 requires an independent government estimate for each contract or modification expected to exceed the simplified acquisition threshold, with access limited to government personnel who need it. Clara drafts it; responsibility stays with your agency.
From estimate to award
One number that carries through to the award
Your estimate does not end up in a drawer. It becomes the yardstick Nova checks the bids against.
- 01
ClaraEstimate the cost
Conceptual estimate and engineer’s estimate, every amount with its source.
- 02
ClaraPrice the bid schedule
Your bid schedule with your prices, as the yardstick for the bids.
Clara bid pricing → - 03
NovaTabulate and check the bids
Bid tabulation, check against your estimate and, for best-value procurements, scoring by your criteria.
About Nova → - 04
NovaAward recommendation
Draft recommendation with the estimate, the leveling and the reasons.
Data
Calculated with your own prices
Clara uses what is in your AI Brain. Where no comparable value exists, you see a point to clarify instead of an invented figure.
- Completed projectsFinal costs and pay applications from your own projects.
- Past bid tabulationsThe unit prices from bids you received in earlier procurements.
- Your cost databaseIf you have one, Clara uses it, marked as the source.
FAQ
Questions from public owners
What is the difference between a conceptual estimate and an engineer's estimate?
A conceptual or budget estimate comes early, from schematic design, and sets the budget at division or system level. The engineer's estimate (independent cost estimate) comes from the construction documents and prices every bid item. Clara drafts both stages.
Where do the prices come from?
From your own data in the AI Brain: completed project costs, the bid tabulations from your past procurements and, if you have one, your cost database. Every amount shows its source: project, year and item. Where no comparable value exists, Clara flags the line instead of inventing a price.
Does it help with federal and state requirements?
For federal construction, FAR 36.203 requires an independent government estimate, prepared as early as practicable, for each proposed contract or modification expected to exceed the simplified acquisition threshold, with access limited to government personnel who need it. Many state and local agencies have similar rules. Clara drafts the estimate and documents its basis; your contracting officer or engineer signs off on it.
How does the estimate help when the bids come in?
The priced bid schedule is Nova's yardstick. Nova compares every bid item by item with your estimate and flags unusually low, high or unbalanced prices for your review before award.
Does Clara replace our estimator or cost consultant?
No. Clara drafts the estimate and shows every calculation. Review, approval and responsibility stay with your engineers, your estimator or the consultant you appointed.
Where is our data stored?
Your data stays in the US. It is not used to train models.
Early access
Your next estimate, with Clara.
In early access we set Clara up with you personally, using your projects and prices. Show us a current project.