Clara · Public ownersEarly access

Independent cost estimates.
For public owners and agencies.

Before you advertise, you need a number that holds up: an estimate to set the budget, choose the procurement path and judge the bids. Clara drafts it from your drawings and your own past prices, by CSI MasterFormat division, every amount with its source. Your engineers review and approve.

CSI MasterFormat · FAR 36.203 · Bid tabulation

Example · Clara drafts, your engineers review and approve

What Clara does

Four results before you advertise

From the first budget number in schematic design to the yardstick you measure the bids against.

  • Schematic design

    Conceptual estimate

    From the schematic design, program or project description, Clara drafts the budget estimate by division or building system.

    • Areas and quantities from the drawings, measured by Theo
    • Benchmarks from your own comparable projects
  • Construction documents

    Engineer's estimate

    With the construction documents, the estimate becomes the independent cost estimate, priced item by item, with changes from the budget explained.

    • Comparison with the conceptual estimate per division
    • Unusual benchmarks flagged for review
  • Procurement file

    Documented basis

    Clara writes up how the estimate was built: sources, escalation to the bid date, quantities and assumptions, ready for the procurement file.

    • Escalation and location adjustment stated
    • Assumptions and exclusions listed
  • Bid schedule

    Priced bid schedule as the yardstick

    Clara prices your own bid schedule before you advertise. When the bids arrive, Nova checks every bid against it.

    • Unit prices per item with their source
    • Low, high or unbalanced bid prices flagged

Estimate stages

Which estimate, when?

Clara covers the estimates you need up to the bid opening.

StageDetailWhat Clara delivers
Conceptual estimateSchematic designDivision or system level, e.g. Div 03 ConcreteDraft per division, with benchmark and comparable project
Engineer's estimateConstruction documentsBid item level, matching your bid scheduleDraft with quantities measured by Theo and a comparison with the budget
Pre-bid checkBefore you advertiseTotal and per bid item, with basisAmount and documented basis for the procurement file

For federal construction, FAR 36.203 requires an independent government estimate for each contract or modification expected to exceed the simplified acquisition threshold, with access limited to government personnel who need it. Clara drafts it; responsibility stays with your agency.

From estimate to award

One number that carries through to the award

Your estimate does not end up in a drawer. It becomes the yardstick Nova checks the bids against.

  1. 01Clara

    Estimate the cost

    Conceptual estimate and engineer’s estimate, every amount with its source.

  2. 02Clara

    Price the bid schedule

    Your bid schedule with your prices, as the yardstick for the bids.

    Clara bid pricing →
  3. 03Nova

    Tabulate and check the bids

    Bid tabulation, check against your estimate and, for best-value procurements, scoring by your criteria.

    About Nova →
  4. 04Nova

    Award recommendation

    Draft recommendation with the estimate, the leveling and the reasons.

Data

Calculated with your own prices

Clara uses what is in your AI Brain. Where no comparable value exists, you see a point to clarify instead of an invented figure.

  • Completed projectsFinal costs and pay applications from your own projects.
  • Past bid tabulationsThe unit prices from bids you received in earlier procurements.
  • Your cost databaseIf you have one, Clara uses it, marked as the source.

More about the AI Brain →

FAQ

Questions from public owners

What is the difference between a conceptual estimate and an engineer's estimate?

A conceptual or budget estimate comes early, from schematic design, and sets the budget at division or system level. The engineer's estimate (independent cost estimate) comes from the construction documents and prices every bid item. Clara drafts both stages.

Where do the prices come from?

From your own data in the AI Brain: completed project costs, the bid tabulations from your past procurements and, if you have one, your cost database. Every amount shows its source: project, year and item. Where no comparable value exists, Clara flags the line instead of inventing a price.

Does it help with federal and state requirements?

For federal construction, FAR 36.203 requires an independent government estimate, prepared as early as practicable, for each proposed contract or modification expected to exceed the simplified acquisition threshold, with access limited to government personnel who need it. Many state and local agencies have similar rules. Clara drafts the estimate and documents its basis; your contracting officer or engineer signs off on it.

How does the estimate help when the bids come in?

The priced bid schedule is Nova's yardstick. Nova compares every bid item by item with your estimate and flags unusually low, high or unbalanced prices for your review before award.

Does Clara replace our estimator or cost consultant?

No. Clara drafts the estimate and shows every calculation. Review, approval and responsibility stay with your engineers, your estimator or the consultant you appointed.

Where is our data stored?

Your data stays in the US. It is not used to train models.

Early access

Your next estimate, with Clara.

In early access we set Clara up with you personally, using your projects and prices. Show us a current project.