What is a waiver of consequential damages in construction?

A waiver of consequential damages is a contract clause in which the owner and contractor give up claims against each other for indirect losses, such as lost profits, lost rental income or loss of business. AIA A201 makes the waiver mutual, and it is one of the clauses owners most often delete or narrow.

How does a waiver of consequential damages work?

Direct damages, such as the cost to fix defective work, stay recoverable. Consequential damages are the losses that flow from the breach, such as an owner's lost revenue from a late opening or a contractor's home office overhead.

In A201-2017 Section 15.1.7, the owner waives items such as rental expenses, losses of use, income, profit and financing, and the contractor waives items such as principal office expenses and lost profit. The section states that it does not preclude liquidated damages provided for in the contract.

Owners often strike the waiver or make it one-sided; that can expose the contractor to large indirect claims.

Where is it in the contract documents?

DocumentClauseWhat it says
AIA A201-2017Section 15.1.7Mutual waiver of consequential damages
ConsensusDocs 200Mutual waiver clauseMutual waiver of consequential damages
Owner-drafted contractsVariesOften deleted or one-sided

What does it look like on a project?

A Texas retail owner deletes the A201 waiver. The store opens three weeks late, and the owner claims lost sales of $380,000 on top of the contract's liquidated damages. With the mutual waiver in place, only the liquidated damages would apply.

IllustrativeExample figures, not a real project.

What should you check?

  • Whether the waiver is present and mutual
  • Carve-outs the owner added
  • How it interacts with liquidated damages
  • Whether your subcontracts flow the same waiver down
  • Insurance coverage for consequential losses

Dora, BAU AI's contract review agent, flags how your contract changes this clause from the AIA base form, cited to the clause and page, for your team and counsel to decide.

Frequently asked questions

What are consequential damages in construction?

Indirect losses that flow from a breach, such as lost profits, lost rental income or loss of business, as opposed to the direct cost to fix the work.

Does the waiver stop liquidated damages?

No. A201 Section 15.1.7 states that it does not preclude liquidated damages set in the contract.

Why do owners delete it?

To keep the right to claim lost revenue from late or defective work. Contractors usually push back or seek a cap.