What is CSI MasterFormat?
CSI MasterFormat is the standard system for numbering and organizing construction specifications in the US and Canada, published by the Construction Specifications Institute and Construction Specifications Canada. It groups work into 50 divisions and gives each specification section a six-digit number, such as 03 30 00 for cast-in-place concrete.
How does CSI MasterFormat work?
The first pair of digits is the division, the second and third pairs narrow the topic. Division 03 is concrete, 03 30 00 is cast-in-place concrete. Division 01 holds general requirements such as submittal procedures (01 33 00) and allowances (01 21 00).
Since the 2004 edition, MasterFormat has 50 divisions, replacing the older 16-division system that many estimators still remember.
Because specifications, submittals, bids and cost codes can all use the same numbers, MasterFormat is how a bid package, a sub bid and a schedule of values line up.
Where is it in the contract documents?
| Document | Clause | What it says |
|---|---|---|
| Project manual | Divisions 00 to 49 | Every specification section |
| Division 01 | 01 33 00 | Submittal procedures |
| Bid tabs and cost codes | Section numbers | Lining up sub bids and budgets by scope |
What does it look like on a project?
On a Texas medical office building, the drywall subcontractor's bid covers 09 21 16 gypsum board assemblies and 09 22 16 metal framing, but excludes 07 84 00 firestopping. Leveling by MasterFormat section shows the gap immediately.
IllustrativeExample figures, not a real project.
What should you check?
- Which edition the specifications follow
- That sub bids are mapped to the same section numbers
- Division 01 sections, which set procedures for every trade
- Sections listed in the table of contents but missing from the manual
- Your cost codes mapped to MasterFormat for history and estimating
Nova, BAU AI's bid leveling agent, levels sub bids to one scope and flags what each one leaves out, cited to the proposal page.
Frequently asked questions
How many divisions does MasterFormat have?
Fifty, numbered 00 to 49, since the 2004 edition. Some are reserved for future use.
Who publishes MasterFormat?
The Construction Specifications Institute (CSI) and Construction Specifications Canada (CSC).
Is MasterFormat the same as UniFormat?
No. MasterFormat organizes by work result and product; UniFormat organizes by building system and element, and is often used in early cost estimates.
Related
Related terms: addendum, bid alternate, bid shopping, allowance, unit price contract, notice to proceed.
Sources
- Construction Specifications Institute and Construction Specifications Canada, MasterFormat
Find this clause in your own contract
Bring one contract or bid package to a 15-minute call. The agents read it with you and cite every finding to its clause and page.