What is an addendum in a construction bid?
An addendum is a written change to the bid documents issued by the owner or architect before bids are due. It can answer questions, correct drawings, add scope or move the due date. Every bidder must acknowledge every addendum, usually on the bid form, and price the changes it makes.
How does an addendum work?
Addenda are numbered and issued to all plan holders. Each one becomes part of the contract documents once the contract is signed, so its changes bind the winning bidder.
On public work, a bid that does not acknowledge an addendum can be rejected as nonresponsive. Under FAR 14.405, a contracting officer may waive a missed acknowledgment only if the bid clearly shows the amendment was received, or the amendment has no more than a negligible effect on price, quantity, quality or delivery.
Late addenda are a common source of scope gaps: subcontractors may price an earlier version of the drawings.
Where is it in the contract documents?
| Document | Clause | What it says |
|---|---|---|
| FAR | 14.208 | Amendment of invitation for bids |
| FAR | 14.405 | When a missed acknowledgment can be waived as a minor informality |
| Bid form | Acknowledgment section | Where each addendum number and date is listed |
What does it look like on a project?
A Travis County, TX school addition issues Addendum 3 two days before bids, changing the roof insulation to a thicker board. The general contractor acknowledges it on the bid form, confirms that the roofing subcontractor priced Addendum 3, and adds the cost difference to its own number.
IllustrativeExample figures, not a real project.
What should you check?
- Every addendum number listed and acknowledged on the bid form
- Every subcontractor and supplier priced the latest addendum
- Changed due dates, pre-bid meetings and bond requirements
- Drawings and specifications replaced by the addendum, not just the narrative
- Questions answered by addendum that change your exclusions
Clara, BAU AI's agent for bids and RFPs, flags this in the bid package with the page it is on, so your team decides before pricing.
Frequently asked questions
What happens if I miss an addendum?
On public work the bid can be rejected as nonresponsive, unless the miss qualifies as a minor informality, such as under FAR 14.405.
Is an addendum the same as a change order?
No. An addendum changes the documents before bids are due; a change order changes the contract after it is signed.
How do subcontractors find out about addenda?
Through the plan room or the general contractor. Confirm each sub priced the latest addendum before you carry their number.
Related
Related terms: bid alternate, bid shopping, CSI MasterFormat, allowance, unit price contract, notice to proceed.
Sources
- FAR 14.208, Amendment of invitation for bids
- FAR 14.405, Minor informalities or irregularities in bids (acquisition.gov)